¡¡
¡¡
|
Nanjing
Clover Medical
Technology Co.,Ltd.
Tel: +86-25-8461
0201
Fax: +86-25-8461 0406
Website:
www.clover-incinerator.com
Email:
cloverincinerator@Gmail.com
Email:
sales@clover-incinerator.com
Service Skype ID: clover-incinerator
>About
Us
>Company
NewsNew
>Newsletters
April 2012
(PDF)
>Catalogue
2012
(PDF)
>Incinerator
Models
>Medical Incinerators
>MSW
Incinerators
>Small Incinerators
>Pet Crematory
>Smoke
Dust FilterNew
>Contact
Us
Medical
Incinerator
¡î
Model YD-30
Incinerator
¡î
Model YD-50
Incinerator
¡î
Model YD-100
Incinerator
¡î
Model YD-200
Incinerator
¡î
Model YD-150
Incinerator
¡î
Model YD-300
Incinerator
¡î
Model YD-500
Incinerator
¡î
Model YD-600
IncineratorNew
Large MSW
Incinerator
¡î
Model MSW1000
Incinerator
¡î
Model MSW2000
Incinerator
¡î
Model MSW3000
IncineratorNew
¡î
Model MSW4000
Incinerator
¡î
Model MSW5500
Incinerator
Small
Incinerator
¡î
Model YD-10
Incinerator
¡î
Model YD-15C
Incinerator
¡î
Model YD-20C
Incinerator
¡î
Model YD-30C
Incinerator
¡î
Model YD-50C
Incinerator
Pet Crematory
¡îAnimal
Crematory A360
¡îAnimal
Crematory A600
¡îAnimal
Crematory A900New
¡îAnimal
Crematory A1500
¡îAnimal
Crematory A2400
¡îAnimal
Crematory A4000
¡î
Model SYC-50
Incinerator
¡î
Model SYC-100
Incinerator
Economical Incinerator
¡î
Model YZ-20
Incinerator
¡î
Model YZ-50
Incinerator
¡î
Model YZ-100
Incinerator
¡î
Model YZ-150
Incinerator
>Light
Oil Burner
>Gas
Burner
>Incinerator
FAQ (PDF)
>How
to Buy
>Photo
Gallery
>Certificate
Request
Dealer
>
Tiếng Việt
>
SiteMap
>Incinerator
News
>Incinerator
Questions
>Incinerator
Inquire
in History
>Market
Analytics
>Friendly Links
¡¡
¡¡
|
Incinerator Question
Call us on 0086-25-8461 0201
Email:
sales@clover-incinerator.com
¡¡
Date:
2013-06-06
Incinerator Question:
Tag:
Saudi
Arabian,
Medical Incinerator Plant,
Incinerator YD-50
Technical specification for
burning machine
1. Two systems are required to be installed in the south of the Kingdom
of Saudi Arabia. The two systems will be used by custom authority to
burn different kinds of drugs. All need equipment must be provided.
2. Warrantee: booth systems must be provided with 3 years warrantee from
the date of acceptance. All needed spare parts, preventative maintenance
repair and corrective maintenance must be included in the cost and
provided to the customer.
3. All needed electric and water connections must be provided.
4. Both systems must be of high quality and must be environmental
friendly.
5. The capacity of each system should be up to 100 kg/hr.
6. The system must have automatic feeding.
7. Each system must consists of two burning rooms, one primary room for
burning the drug and another room for burning the gases that emit as a
result of primary burning.
8. The oven must be made of steel that is rust resistance and with
thickness not less than 6 mm.
9. Each system must be of high efficient in burning different kinds of
drugs, and should have 99.9% efficiency for burning organic materials.
10. Waste products should not exceed 5%.
11. System must have automatic ignition system.
12. System should use diesel (HSD) as fuel and should not consume more
than 8 to 10 lt/hr .
13. Each system should be provided with fuel tank of size adequate to
operate the system for one full day.
14. The temperature in the primary room should be 850 C ¡À 50 C. the
system should also be capable to operate up to 1050 C ¡À 50 C. the system
should be capable of continues operation and should be provided with
cement layer insulator with adequate thickness.
15. Oven should be provided with heat insulator to allow easy operation.
16. Gas should remain in the secondary room for not more than 1.5
second.
17. The primary burning room should have at least 2 burners.
18. The secondary burning room should have one burner.
19. Each system should have doors for ash, exit for air to the chimney
and windows to allow looking inside and for maintenance.
20. Each system should have filtering system for gas processing with 2
tanks using ordinary water. Each water tank should have capacity of 1000
lt and should be fixed to the system and provided with water level
indicator.
21. Each system should have special technology for separating waist
products and humidity after gas processing.
22. Each system should have cooling capability after operation.
23. Each system m should be provided with exhaust pipe with 250 mm
diameter and 10 m high. The base of the exhaust system should be 1000
mm. The exhaust pipe should be 6 mm and should be provide with heat
insulator. The exhaust system should be provided with pressure
indicator. It should also provide with ladder and Lightning Arrestor.
24. Electric power: should be 220 volt, 3 phase, 60 Hz, and the motor
should not be less than 15 HP.
25. Each system should be provided with control panel and indicators and
needed safety equipment and alarm systems. The control panel should show
at least temperature in both the primary and secondary rooms and
injectors of the filters and load.
26. Each system should be provided with alarm system for any breakdown
or defect of any component of the system.
27. The following personal protective tools must be provide:
a. Heat resistant garments for 20 persons.
b. Heat resistant goggles for 20 persons.
28. All components of each system should be painted with silver color
that is heat resistant.
¡¡
Incinerator Answer:
reference website:
http://www.clover-incinerator.com/incineratoryd50.htm
pet incinerator price incinerator china medical incinerator
small scale incinerator clover incinerator incinerator 500kg per medical
waste incinerator
animal incinerator prices china incinerator incinerator animal incinerator price
clover incinerater incinerator installation demo
incinerator manufacturers china small incinerator
¡¡
¡¡
¡¡
¡¡
¡¡ |
¡¡ ¡¡
¡¡
¡¡
November,
2012
2012-11-18
2012-11-19
2012-11-20
2012-11-21
2012-11-22
2012-11-23
2012-11-24
2012-11-25
2012-11-26
2012-11-27
2012-11-28
2012-11-29
2012-11-30
December,
2012
2012-12-01
2012-12-02
2012-12-03
2012-12-04
2012-12-05
2012-12-06
2012-12-07
2012-12-08
2012-12-09
2012-12-10
2012-12-11
2012-12-12
2012-12-13
2012-12-14
2012-12-15
2012-12-16
2012-12-17
2012-12-18
Jun, 2013
2013-06-01
2013-06-02
2013-06-03
2013-06-04
2013-06-05
2013-06-06
2013-06-07
2013-06-08
2013-06-09
2013-06-10
2013-06-11
2013-06-12
2013-06-13
2013-06-14
2013-06-15
2013-06-16
2013-06-17
2013-06-18
2013-06-19
2013-06-20
2013-06-21
2013-06-22
2013-06-23
2013-06-24
2013-06-25
2013-6-26
2013-06-27
2013-06-28
2013-06-29
2013-06-30
|
¡¡ |