¡¡

Nanjing Clover Medical Technology Co., Ltd.

¡¡ ¡¡
¡¡ Medical Incinerators /  Animal Crematory / MSW Incinerators ¡¡

 

¡¡ ¡¡ ¡¡




¡¡



¡¡

¡¡      
   ººÓï   
   English   
   P§å§ã§ã§Ü§Ú§Û ¡¡

 Nanjing Clover Medical Technology Co.,Ltd.
 Tel: +86-25-8461 0201
 Fax: +86-25-8461 0406
 Website:
www.clover-incinerator.com
 Email:
cloverincinerator@Gmail.com
 Email:
sales@clover-incinerator.com
 Service Skype ID: clover-incinerator

>About Us

>Company NewsNew

>Newsletters April 2012 (PDF)

>Catalogue 2012  (PDF)

>Incinerator Models

>Medical Incinerators

>MSW Incinerators

>Small Incinerators

>Pet Crematory

>Smoke Dust FilterNew

>Contact Us

 Medical Incinerator

¡î Model YD-30 Incinerator

¡î Model YD-50 Incinerator

¡î Model YD-100 Incinerator

¡î Model YD-200 Incinerator

¡î Model YD-150 Incinerator

¡î Model YD-300 Incinerator

¡î Model YD-500 Incinerator

¡î Model YD-600 IncineratorNew

 Large MSW Incinerator

¡î Model MSW1000 Incinerator

¡î Model MSW2000 Incinerator

¡î Model MSW3000 IncineratorNew

¡î Model MSW4000 Incinerator

¡î Model MSW5500 Incinerator

 Small Incinerator

¡î Model YD-10 Incinerator

¡î Model YD-15C Incinerator

¡î Model YD-20C Incinerator

¡î Model YD-30C Incinerator

¡î Model YD-50C Incinerator

 Pet Crematory

¡îAnimal Crematory A360

¡îAnimal Crematory A600

¡îAnimal Crematory A900New

¡îAnimal Crematory A1500

¡îAnimal Crematory A2400

¡îAnimal Crematory A4000

¡î Model SYC-50 Incinerator

¡î Model SYC-100 Incinerator

 Economical Incinerator

¡î Model YZ-20 Incinerator

¡î Model YZ-50 Incinerator

¡î Model YZ-100 Incinerator

¡î Model YZ-150 Incinerator


>Light Oil Burner

>Gas Burner

>Incinerator FAQ (PDF)

>How to Buy

>Photo Gallery 

>Certificate

Request Dealer

> Tiếng Việt

> SiteMap

>Incinerator News

>Incinerator Questions

>Incinerator Inquire in History

>Market Analytics

>Friendly Links

¡¡

¡¡

Incinerator Question

Call us on  0086-25-8461 0201  Email: sales@clover-incinerator.com

¡¡

Date: 2013-06-01

  Incinerator Question:  

  Tag:  Papua New Guinea, Medical Incinerator Plant, Incinerator YD-50

SPECIFICATIONS

DESCRIPTION

The Medical Waste Disposal Incinerator Unit shall be of Dual or Multiple Chamber type that thermally degrades combustible medical wastes of varying heat content using a two-stage or multiple stages combustion processes. That is first stage of thermal waste degradation in the primary chamber and second stage of smoke burning (flue gas treatment) in the secondary chamber. The waste burning process per cycle shall be fully automatic from start to finish. The waste incinerator unit shall consist of a primary chamber, secondary chamber, stack, combustible air blower, burners and controls as the main components.

WASTE INCINERATOR CAPACITY

The waste incinerator unit shall be designed to burn medical waste load of capacity 50kg/hr with calorific values ranging from 2, 300 kJ/kg to 30, 000 kJ/kg at a designed thermal rate of 1, 440, 000 kJ/hr.

METHOD OF WASTE CHARGING

Waste shall be fed into the primary chamber manually, that is by hand. Semi-automatic or automatic feeding systems are not required.

METHOD OF BURNING

The primary and secondary burners shall be equipped with at least one fuel oil burner each. Waste shall be manually fed into the primary chamber and heated to required ignition temperature of at least 600 degree Celsius. A controlled amount of air shall be admitted by combustion air blower to maintain the necessary reaction heat required for thermal degradation of waste. Smoke, ashes, volatile gases etc, generated from the primary chamber shall be effectively and efficiently ignited in the secondary chamber. Emission through the stack shall be within environmental standards.

COMBUSTION CHAMBERS

The internal lining for combustion chambers shall be made up of pre-determined thickness and high temperature stability insulation, high strength firebricks and castible refractory. The temperature rating for refractory shall be at least 1, 500 degree Celsius. The casing of the chamber shall be constructed from high grade mild steel plate. Lifting devices such as eye bolts and lifting lugs shall be fitted as standard.

DOORS

The doors shall be hinged on the right hand side and can be easily opened and closed. All doors shall be manually operated. Incinerators shall NOT incorporate automatic doors. All doors should be internally lined with pre-determined thickness insulation and refractory cement.

STACK

The stack shall be fabricated from pre-determined thickness stainless steel plate suitably flanged for connection.

COMBUSTION AIR BLOWER

A combustion air blower shall be of steel construction type with built-in air damper regulation shall be provided. The impeller shall be of the radial blade design and all rotating elements shall be dynamically balanced.

BURNERS

Burners fitted shall be of packaged fuel oil fired types. Primary chambers shall be fitted with an on/off type burner while the secondary chamber shall be fitted with a high/low burner. The burners shall each have a maximum rating of 330, 000 kJ/hr.

CONTROLS

A control system shall be provided to control all functions of the primary and secondary chambers including combustion air distribution and burner control. It shall comprise of PLC, temperature controllers, timers, relays and switches to provide automatic operation of the entire system. All switches and controls shall be mounted in an IP 55 rated control panel.

POWER SUPPLY

The incinerators shall have a power supply of 240/415 volts, 50Hz AC. All electrical works shall conform to SAA Wiring Rules SA 3000.

FINISH

All equipment shall be painted with a coat of zinc rich primer and two coats of high temperature heat resistant polyurethane type paint. All painted surfaces shall be prepared by either steel shot cleaning or sand blasting.

FUEL TYPE AND TANK

The burners shall be fueled oil (diesel) fired.

OTHERS

              Incinerator Plant lay-out,

              List of Equipment and Installation Services,

              Site Preparation, Installation and Other Services

              Recommended Spare Parts

              Installation Program or Execution Plan

 

COSTINGS

Shall include total cost of unit including supply, delivery, installation, commissioning and training of operational technician

¡¡

  Incinerator Answer:  

  reference website: http://www.clover-incinerator.com/incineratoryd50.htm

incineration equipment manufacturers e-waste incineration of waste in ghana incinerator 20kg per hour price incinerator 50 kg
incinerator 50kg


incinerator calculation incinerator capacity calculation incinerator combustion experts in china incinerator company incinerator
dealership incinerator equipment incinerator equipment for sale in shenzhen incinerator equipment manufacturers in shanghai incinerator
for hospital

¡¡

¡¡

¡¡

¡¡

¡¡

¡¡

¡¡

¡¡

¡¡

November, 2012

2012-11-18

2012-11-19

2012-11-20

2012-11-21

2012-11-22

2012-11-23

2012-11-24

2012-11-25

2012-11-26

2012-11-27

2012-11-28

2012-11-29

2012-11-30

December, 2012

2012-12-01

2012-12-02

2012-12-03

2012-12-04

2012-12-05

2012-12-06

2012-12-07

2012-12-08

2012-12-09

2012-12-10

2012-12-11

2012-12-12

2012-12-13

2012-12-14

2012-12-15

2012-12-16

2012-12-17

2012-12-18

Jun, 2013

2013-06-01

2013-06-02

2013-06-03

2013-06-04

2013-06-05

2013-06-06

2013-06-07

2013-06-08

2013-06-09

2013-06-10

2013-06-11

2013-06-12

2013-06-13

2013-06-14

2013-06-15

2013-06-16

2013-06-17

2013-06-18

2013-06-19

2013-06-20

2013-06-21

2013-06-22

2013-06-23

2013-06-24

2013-06-25

2013-6-26

2013-06-27

2013-06-28

2013-06-29

2013-06-30

¡¡

Nanjing Clover Medical Technology Co., Ltd.

Rm.411, 07 Building, East Wanda Plaza, 58# Yunjin Road, Nanjing, P.R.China Post Code: 210019
Tel: +86-25-84610201 Fax: +86-25-84610406
Website: www.clover-incinerator.com Email: cloverincinerator@Gmail.com

Copyright 2010 Clover Medical Limited All Rights Resered.