Supply,
installation and testing of medical waste incinerator with a capacity of
75 kg / h gas (LPG) complete with all accessories and consequently with
the chimney in accordance with the technical specifications and
conditions of public health
A special chamber Holocaust accommodate three burners as in item 3.1.1
and Appendix Chamber of the Holocaust store Nqayat accommodate waste for
seven days and all the constructions of reinforced concrete with the
processing building, the Holocaust and store all of the wiring and
electrical and lighting systems and water supply and sanitation
Provide the building of the Holocaust and waste repository extinguish a
fire sprinkler system depends on the source of water from the network,
as well as the general location of a fire alarm system contains sensors
for temperature, smoke, this system might be linked with the hospital's
fire alarm systems
Supply, installation and testing of ventilation system for the algebraic
Chamber of the Holocaust and a central warehouse by fans ROOF TOP
EXHAUET FANS provide them with high efficiency filters (HEPA FILTER fans
mounted on the pull with the rate of change of air, taken 5 times per
hour, with streams and the required air Ejreblat
Supply, installation, testing and conditioning unit to separate waste
repository DUCTED SPLIT UNITES and a capacity sufficient to maintain the
internal temperature at 14 degrees Celsius in summer and Sheta