Primary Combustion Chamber Secondary Combustion Chamber Smoke Filter Chamber Incinerator PLC Control Case Chimney:6.0Meters *(upgrade to Stainless Steel, free cost) Italy oil burner: 04 sets Oil Tank (if oil fuel): 800Liters The secondary chamber must comply with the following minimum criteria: “• Heavy steel construction small scale incinerators incinerator burner • An excess air and high temperature operational mode. • Sufficient size and appropriate geometry to achieve a gas temperature of at least 1000 Celsius for a retention time of at least 2 seconds when pre-heated and correctly operated. • Sufficient forced air inflow and airflow and fuel supply controls to ensure an exhaust gas oxygen content range of 6-12% at all times. • Hot face refractory concrete-ceramic suitable for thermal shock up to 1400 Celsius and abrasion. Minimum thickness 150mm. • Cold face refractory lining of calcium silicate or superior material, minimum thickness 100mm. • Refractory lining of all the ducts shall be done with refractory castings. Superior quality ceramic wool shall be used at all hot duct flanges and expansion joints • An electrically powered fan forced air supply, with the capacity for variation by the operator. • One or more fuel burners designed to use diesel fuel type 2 (vehicle standard) equipped with a spark igniter. • A digital thermometer with connected to an electronic datalogger. The thermometer shall be located on the chamber wall away from the fuel burner. Medical Waste Incineration Treatment Average 1000-1500 kg/hour Average 6000kg/feeding PLC(Programmable Logic Controller Incinerator) 4800Liter A heat exchanger to pre-heat air destined for the primary chamber is not compulsory but recommended. The combustion air systems and fans shall be designed to ensure high combustion efficiency and avoid a reducing (corrosive) atmosphere, incomplete burnout of the flue gases and related problems. It should also be possible to heat the primary air from 10°C to approximately 145°C, depending on the waste composition and moisture content. “The incinerator shall be designed and equipped to be installed, commissioned and operated in such a way as to prevent emissions into the air giving rise to significant ground-level air pollution; in particular, exhaust gases shall be discharged in a controlled fashion by means of a stack the height of which is calculated in such a way as to safeguard human health and the environment. All incinerators shall meet the following emission and operating standards: • Combustion efficiency (C.E.) shall be at least 99.0% • The combustion efficiency shall be computed as follows: • The diameter of the stack shall be selected by the Contractor to deliver an exhaust exit velocity of not less than 10 metres per second vertically upwards when at full scale operation. • An emission stack sampling port shall be included immediately above the secondary chamber. ” Controlled hygienic, mechanical or automatic feeding methods must not negatively influence the air supply and temperature in the primary and secondary chambers of the incinerator. “Each unit shall include a diesel fuel storage tank of sufficient capacity to enable operation of the unit for 5 working days of 10 hours each. • The unit shall include a pumping system and lines to supply the burners from the tank and the diesel-electric generator. The pumping system will have two pumps in parallel for redundancy. • The supply lines will be fabricated from steel tubing and adequately protected and supported against damage during operations and include shutoff valves for each line. • The unit shall be equipped with a fuel meter. “Incinerators must be able to support different power sources (PV solar system , diesel Electric generator , local or compound mini-scale grid) The proposed incinerators shall be able to be completely packed into a series of 20ft export standard sea containers. All electrical connections attached with the incinerator and other machinery should be provided with suitable and necessary safety devices and be protected by steel conduits, cable trays, and supports. The manufacturer should permanently mark on the incinerator indicating: (i) manufacturer’s name or trademark (ii) style, type, model or, date of manufacture of the incinerator (iii) capacity in terms of net designed heat release in heat units per timed period (i.e., British Thermal Units per hour, mega joules per hour, kilocalories per hour). “The unit shall be supplied with a lockable operations store, that shall be initially supplied with the following consumables: • A first aid kit, suitable for addressing the hazards presented by the unit. • 5 full sets of personal protective clothing and equipment. • Operating logbooks. […]
The new plant could help in reducing energy losses in the incineration process as well as reducing harmful emissions Wasteserv inaugurated a $12 million animal waste management in Marsa earlier now. Speaking at the inauguration of the new Wateserv EU-funded autoclave producing plant for the treatment of animal waste, Wasteserv CEO Tonio Montebello reported that […]
News from: https://www.thestar.com.my/news/nation/2020/01/26/wuhan-virus-china-mobilises-medical-teams-to-fight-new-coronavirus WUHAN (Bernama): China is mobilising medical staff to aid Wuhan, the centre of the novel coronavirus (2019-nCoV) outbreak, as the country reported 830 confirmed cases of pneumonia, caused by the virus and 25 deaths by the end of Thursday (Jan 23). By Thursday midnight, Hubei Province in central China reported 549 cumulative confirmed […]
Basic Info. Type:Incinerator Export Markets:Global Additional Info. Trademark:CLOVER Product Description Nanjing Clover Medical Technology Co., Ltd.. Items/Model YD-10C YD-20C YD-30C YD-50C Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr. Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs Equipment Weight 1200 kgs 1200 kgs 1800 kgs 2200 kgs Primary Chamber […]
Basic Info. Export Markets:Global Additional Info. Trademark:CLOVER Origin:Pr China Production Capacity:1000 Sets Per Year Product Description 2.
Model CA50 Picture Waste Treatment Waste Incineration Treatment Feed Capacity Average 100 kgs per feed Burning Rate Average 50 kgs per hour Burning Time per Feed Average 2 hour Control Mode PLC(Programmable Logic Controller Incinerator) Voltage 220V Power 0.7Kw Fuel Diesel oil Burner Italy Burner Feed Mode Manual Temperature Monitor Digital Display Fuel consumption (Oil) […]
WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel: +86-25-8461 0201 Mobile: +86-13813931455(whatsapp/wechat)Website: www.hiclover.com Email: sales@hiclover.comEmail: hicloversales@gmail.com Model TS30 PLC Main Product List per 01 set Primary Combustion Chamber Secondary Combustion Chamber Smoke Filter Chamber Incinerator PLC Control Case Chimney:5.0Meters *(upgrade to Stainless Steel, free cost) Italy oil/gas burner: 02 sets Oil Tank (if oil fuel): 100Liters
Basic Info. Pullution Sources:Solid Waste Processing Processing Methods:Combustion Export Markets:Global Additional Info. Trademark:CLOVER Origin:Cn Production Capacity:1000 Sets Per Year Product Description We supply incinerator and also burners. Some model of incinerator use Italy original burner (gas or oil fuel) and some model use China original burner. Generally, incinerator with two burners but we can add […]
Items/Model TS2000 (Top Feeding) Principle Waste Incineration Treatment Burn Rate Average 500-600kg/hour Feed Capacity Average 4500kg/feeding Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 7700Liter (7.7m3) Internal Dimensions 5000*1400*1100 mm Secondary Chamber 4000Liter (4.0m3) Feed Mode Manual/Forklift/Crane Description Brand Model Fuel Type Waste Incinerator HICLOVER TS2000 Oil/Gas *Primary combustion chamber *Secondary combustion chamber * Stainless Steel chimney *Auto PLC control system *Italy brand burner * Automatic Protection Operator(APO) *Heavy duty refractory chamber *Corundum […]
Product Description Nanjing Clover Medical Technology Co., Ltd.. Presently, we supply different series for local client requirements and layout upgraded incinerator with our top technology. The upgraded design feature of our range of incinerators make them among the most cost effective in the world. Items/Model TS30(PLC) Burn Rate 30 kg/hour Feed Capacity 60kg Control Mode […]
Basic Info. Pullution Sources:Solid Waste Processing Processing Methods:Combustion Export Markets:Global Additional Info. Trademark:clover Product Description The incinerator lines have little scale to large scale, up to 500kgs per hour. The combustion chamber use high strength material, expensive cost but better quality than competitors. Incinerator operation system utilize PLC program control manner, give the complex manual […]
Basic Info. Export Markets:Global Additional Info. Trademark:CLOVER Product Description Key Attributes: * All models with Dual combustion room. *based on order * Stainless Steel chimney/stack, long lifetime. *based on order * High temperature, long lifetime of incinerator. * Free or minimum installation on site. * High burn rate, from 10kgs to 500kgs per hour, up […]
