Day: November 8, 2025

Phone: +86-13813931455(whatsapp/wechat)Website: http://www.hiclover.com/  Email: sales@hiclover.comEmail: hicloversales@gmail.com   Nanjing Clover Medical Technology Co.,Ltd.
Incinerator Model TS55 PLC, Overview This model is small-scale waste incineration equipment for small waste output.  Construction is dual/double combustion chamber with 02 sets oil/gas burner,  batch load incineration equipment. Waste feed chamber is 400Liters (0.40m3, TS55 PLC).  Primary & Secondary combustion chambers and smoke filter chamber. Batch load on the  bottom of chamber. Incinerator […]
Basic Info. Model NO.:30kg/hr medical incinerators Export Markets:Global Product Description Technology Respond(FAQ)  Q: What is kind of waste can use in this equipment?  A: This equipment for medical waste, pet creature, Municipal waste, live waste. Prohibit any explosive and radiation substance, liquid waste and gas waste.  Q: Incinerator Smoke Standard  A: China Government Standard: No. […]
CAPACITY : Burner 150 kg/hr. Quantity: Two [2] with complete accessories. kinds of wastes being used: GENERAL WASTE The  machines will be certified for operation from PME after passing site investigations. The technical details we all care about are: –          Ability (burning capability of waste per hour). 150kg/hour. –          Assemble materials, 5mm High quality mild […]
Waste Incinerator Door: Side/Front Opening Door VS. Top Opening Door Items Side Loading Door Top Loading Door Reference Cost Cheap High cost Manufacture Tech. Easy A litter difficult Safty safe safer Incinerator Shape L/ I L Loading manual big door can be by Forklift Land occupation small big Ash door same with feeding door or […]
Basic Info. Model NO.:heat of combustion of pig incineration of carca Export Markets:Global Product Description Nanjing Clover Medical Technology Co., Ltd.  Nanjing Clover Medical Technology Co., Ltd.. Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC) Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour Feed Capacity 20kg 40kg 60kg 100kg 200 kg Control Mode […]
Basic Info. Model NO.:pet incinerator manufacturers Export Markets:Global Product Description TS model PLC incinerator is latest design for waste treatment, include medical waste, animal cremation and other solid waste. This gear quality structural for types of site, such as hospital, environmental division, animal cremation services, etc… CLOVER diesel incinerator, diesel incinerator 50 kg/hr, diesel livestock […]
Product Description Principle of This Incinerator equipment is incineration/combustion/burn. Items/Model TS100(PLC) Burn Rate 100 kg/hour Feed Capacity 200 kg Control Mode PLC Combustion Chamber 1200L Internal Dimensions 120x100x100cm Secondary Chamber 600L Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V Power 0.7Kw Oil Consumption (kg/hour) 14–28 Gas Consumption (m3/hour) 10–32.2 Temperature Monitor Yes Temperature Protection […]
The Incinerator units shall be designed to last in operation in a tropical environment for a minimum period of 10 years if the specified maintenance schedule is followed. All metal surfaces (except combustion chamber internal fittings) shall be either galvanized, enameled, painted or otherwise treated against atmospheric and process induced corrosion The incinerator combustion chamber(s) […]
Medical waste, disposable syringes, infusion sets processing, cotton yarn, the operating room, the residual limb, waste rubber gloves,  protective clothing and infectious and harm venereal hospital bed supplies, general wastes.   Incinerator Items/Model HICLOVER YD300(PLC) HICLOVER YD500(PLC) Burn Rate (Average) 300-500 kg/hour 500-600 kg/hour Feed Capacity(Average) 480kg/feeding 800kg/feeding Control Mode PLC Automatic PLC Automatic Primary Combustion Chamber 2400L(2.4M3) 4000L(4.0M3) Internal Dimensions 220x110x100cm 257x147x108cm Secondary Chamber 1200L 1500L Smoke Filter Chamber Yes Yes Feed Mode Manual Manual Voltage 220V 220V   Burning temperature First combustion chamber: 800- 900 ℃ ; Secondary combustion chamber:2000℃ Flue gas residence time≥1s […]
HICLOVER Fighting COVID-19 CE ISO
HICLOVER Hot Blogs
Recent Posts