Day: September 25, 2025

Basic Info. Export Markets:Global Additional Info. Trademark:CLOVER Packing:Container Origin:Nanjing China Production Capacity:1000 Sets Per Year Product Description   How to Buy Incinerator 1.  Nanjing Clover Medical Technology Co., Ltd. conserve all rights to mend/update product information on website. The specifications are subject to change without prior notice. 2. We accept company duration: FOB/C&F/CIF word, by sea/train, full container […]
WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel:  +86-25-8461 0201    Mobile: +86-13813931455(whatsapp/wechat)Website: www.hiclover.com  Email: sales@hiclover.comEmail: hicloversales@gmail.com   Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC) Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour Feed Capacity(Average) 20kg 40kg 60kg 100kg 200 kg Control Mode PLC PLC PLC PLC PLC Combustion Chamber 100L 210L 330L 560L 1200L Internal Dimensions 50x50x40cm 65x65x50cm […]
Items/Model TS2000 (Top Feeding) Principle Waste Incineration Treatment Burn Rate Average 500-600kg/hour Feed Capacity Average 4500kg/feeding Control Mode PLC(Programmable Logic Controller Incinerator) Combustion Chamber 7700Liter (7.7m3) Internal Dimensions 5000*1400*1100 mm Secondary Chamber 4000Liter (4.0m3) Feed Mode Manual/Forklift/Crane   Description Brand Model Fuel Type Waste Incinerator HICLOVER TS2000 Oil/Gas *Primary combustion chamber *Secondary combustion chamber * Stainless Steel chimney *Auto PLC control system *Italy brand burner * Automatic Protection Operator(APO) *Heavy duty refractory chamber *Corundum […]
Basic Info. Export Markets:Global Product Description How you are able to find reasonable incinerator to your regional website?  Incinerator isn’t a cheap equipment, normally the little scale version 's cost around $5, 000usd per unit and big scale version 's cost more than $50, 000usd each unit. Incinerator is a incineration equipment, function is fire […]
Primary Combustion Chamber Secondary Combustion Chamber Smoke Filter Chamber Incinerator PLC Control Case Chimney:6.0Meters  *(upgrade to Stainless Steel, free cost) Italy oil burner: 04 sets Oil Tank (if oil fuel): 800Liters The secondary chamber must comply with the following minimum criteria: “• Heavy steel construction small scale incinerators incinerator burner • An excess air and high temperature operational mode. • Sufficient size and appropriate geometry to achieve a gas temperature of at least 1000 Celsius for a retention time of at least 2 seconds when pre-heated and correctly operated. • Sufficient forced air inflow and airflow and fuel supply controls to ensure an exhaust gas oxygen content range of 6-12% at all times.  • Hot face refractory concrete-ceramic suitable for thermal shock up to 1400 Celsius and abrasion. Minimum thickness 150mm.  • Cold face refractory lining of calcium silicate or superior material, minimum thickness 100mm.  • Refractory lining of all the ducts shall be done with refractory castings. Superior quality ceramic wool shall be used at all hot duct flanges and expansion joints • An electrically powered fan forced air supply, with the capacity for variation by the operator. • One or more fuel burners designed to use diesel fuel type 2 (vehicle standard) equipped with a spark igniter.   • A digital thermometer with connected to an electronic datalogger. The thermometer shall be located on the chamber wall away from the fuel burner. Medical Waste Incineration Treatment Average 1000-1500 kg/hour Average 6000kg/feeding PLC(Programmable Logic Controller Incinerator) 4800Liter A heat exchanger to pre-heat air destined for the primary chamber is not compulsory but recommended.  The combustion air systems and fans shall be designed to ensure high combustion efficiency and avoid a reducing (corrosive) atmosphere, incomplete burnout of the flue gases and related problems. It should also be possible to heat the primary air from 10°C to approximately 145°C, depending on the waste composition and moisture content. “The incinerator shall be designed and equipped to be installed, commissioned and operated in such a way as to prevent emissions into the air giving rise to significant ground-level air pollution; in particular, exhaust gases shall be discharged in a controlled fashion by means of a stack the height of which is calculated in such a way as to safeguard human health and the environment. All incinerators shall meet the following emission and operating standards: • Combustion efficiency (C.E.) shall be at least 99.0% • The combustion efficiency shall be computed as follows: • The diameter of the stack shall be selected by the Contractor to deliver an exhaust exit velocity of not less than 10 metres per second vertically upwards when at full scale operation. • An emission stack sampling port shall be included immediately above the secondary chamber. ” Controlled hygienic, mechanical or automatic feeding methods must not negatively influence the air supply and temperature in the primary and secondary chambers of the incinerator. “Each unit shall include a diesel fuel storage tank of sufficient capacity to enable operation of the unit for 5 working days of 10 hours each. • The unit shall include a pumping system and lines to supply the burners from the tank and the diesel-electric generator.  The pumping system will have two pumps in parallel for redundancy. • The supply lines will be fabricated from steel tubing and adequately protected and supported against damage during operations and include shutoff valves for each line.  • The unit shall be equipped with a fuel meter. “Incinerators must  be able to support different power sources (PV solar system , diesel Electric generator , local or  compound mini-scale grid) The proposed incinerators shall be able to be completely packed into a series of 20ft export standard sea containers. All electrical connections attached with the incinerator and other machinery should be provided with suitable and necessary safety devices and be protected by steel conduits, cable trays, and supports. The manufacturer should permanently mark on the incinerator indicating: (i) manufacturer’s name or trademark (ii) style, type, model or, date of manufacture of the incinerator (iii) capacity in terms of net designed heat release in heat units per timed period (i.e., British Thermal Units per hour, mega joules per hour, kilocalories per hour). “The unit shall be supplied with a lockable operations store, that shall be initially supplied with the following consumables: • A first aid kit, suitable for addressing the hazards presented by the unit. • 5 full sets of personal protective clothing and equipment. • Operating logbooks. […]
Average 20%-25% of the total waste generated by healthcare establishments is  regarded as hazardous and may create a variety of health and environmental risks  if not managed and destroyed in an appropriate manner. With years worth of experience in this sector, our medical range of incinerators are  designed to cater for the economical needs of […]
single shaft shredder is firm and durable.The machine adopts knife rolls structure with  dense platoon small bit, and was equipped with compulsion feed by push yard lumber  and so on, it has the follows merits: slow-speed rotation, low noise, big torque,  highly effective energy conservation. WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel:  +86-25-8461 0201    Mobile: +86-13813931455(whatsapp/wechat)Website: www.hiclover.com  Email: sales@hiclover.comEmail: hicloversales@gmail.com   […]
Each incinerator shall be supplied with all necessary assembly/disassembly tools. Spare parts and consumables The proposed incinerator systems shall include all  necessary spare parts, PPE, and consumables required for 2 years of operation.  https://twitter.com/i/status/1578045332285698049  Incinerator Items/Model HICLOVER YD30(PLC)   Burn Rate (Average) 30-50kg/hour(Medical Waste) 10-15kg/hour(Pet Animal Cremation) Feed Capacity(Average) 40kg/feeding Control Mode PLC Automatic Primary […]
The new plant could help in reducing energy losses in the incineration process as well as reducing harmful emissions Wasteserv inaugurated a $12 million animal waste management in Marsa earlier now. Speaking at the inauguration of the new Wateserv EU-funded autoclave producing plant for the treatment of animal waste, Wasteserv CEO Tonio Montebello reported that […]
HICLOVER Fighting COVID-19 CE ISO
HICLOVER Hot Blogs
Recent Posts