Medical waste incinerator for sale

Stainless steel or Mild steel outer with thickness 5mm or more, 
sheet should be painted with heat resistant and anti-corrosive paint.
Internal surface of incinerator should be line with noncracking refractory 
bricks made of ceramics or concrete to withstand the temperature of 1400 oC, 
furthermore bricks must be backed by thermal insulation and have thickness in 
between 220C250 mm.

Model

A2400

Picture

Burning Rate

Upto 150 kgs/hour

Feed Capacity

Upto 200 kgs

Primary Combustion Chamber

2400 Liters

Secondary Combustion Chamber

1200 Liters

Mix Combustion Chamber

Yes

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V/380V

Power

1.48Kw

Fuel Type

Diesel Oil/ Natural Gas/LPG

Burner

Italy Original

Oil Consumption (Diesel Oil)

26--48.1 kg/hour

Gas Consumption (Natural Gas)

16.1--48.8 m3/hour

Internal Dimensions

220 x 110 x 100cm (primary chamber)

External Dimensions

260 x 220 x 420cm (without chimney)

Temperature Monitor

Yes

Oil Tank Capacity(if oil fuel)

500 Liters

Door Opening

90 x 110cm

Chimney Length

10.0 Meters

Chimney Type

Stainless Steel

Equipment Gross Weight

9300 kgs

Operation Technical Specifications

Primary Chamber Temperature

800-1000

Secondary Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Burning Efficiency

98%

Waste Lower Calorific Power

3000Kcal


Electrical: Single Phase Voltage 220 V, 3- Phase Voltage 400 V & Frequency 50 Hz. 
Water Supply: Available pressure is 2 PSI. 
Natural Gas: Available pressure 5-7 lb/in2. 
Mobile main trolley of SS with cover for transportation of hospital waste from 
wards to incinerator site / room. (May be provided locally)
Bin trolley Red for infectious waste Yellow for Sharps/glass and needles, Blue for non-infectious waste. Trolley Volume: 5 liter  Wall thickness : 1.35 mm Trolley should 
have flap cover (May be provided locally)
 35 in each color Total Qty 105 Nos
Plastic Waste Bags Yellow, Red and blue(May be provided locally)
The flue gasses should have emission gases under limits provided by Ministry of 
Environment, local Government and Rural development Pakistan (National Environmental 
and Quality standards (NEQs) Firm will be responsible once after installation for lab 
testing of emission gases as per requirement of Environmental Protection Agency (EPA) 
Pakistan as mentioned above. Firm will be responsible for Approval of all drawings from 
EPA before starting of project and certification from EPA when project is successfully done. 
Automatic loading system to minimize user intervention. 