Large incinerators – INDUSTRIAL INCINERATORS 2.) Size requirement for the incinerators is 750 — 850 kg capacity 3.) The bum rate should be 80 LL 100 kg/ hour. 4) The primary chamber shouId have an operating temperature of 900 -1200 degree C. 5) The incinerator should hate a high temperature secondary chamber and 2 second gas retention time at 850- 1150 degree C so that it is suitable for high risk materials. 6). The incinerator should have temperature monitoring and thermostat control for ease of operation and assurance of bum temperature to confirm correct operation. 7). The incinerator should be capable of burning any of the hazardous wastes listed in the subsequent section. 8) The incinerator should be capable of burning diesel oil and should include a larger fuel tank (10-500 litres) and generator (3 –40 kV) set that can be carried on the trailer with the incinerator so that the unit requires no external electrical power supply. 9.) The incinerator should be trailer mounted so that it is a po Hazardous Waste to be Incinerated Hazardous solid chemical: Different types of combustible solids, used textiles, grease, and toner cartridges, chemicals for water purification and photographic consumables and plastic material, empty plastic/metal cans that still contain remnant hazardous material, oil absorbent. Hazardous liquid chemical: Mainly different types. of Acid, Paint, Varnish, Acetone, White Spirit Aromatic-less Solvents, Synthetic Liquid for Break Systems, Aircraft De-icing Liquid, Hydraulic and Compressor oil, Freon, used in some older refrigeration units, Insecticide liquid/spray, air refresh spray and other similar chemicals….