Day: October 19, 2025

The permit that enables the Radford Army Ammunitions Plant to burn toxic waste from guns outdoors is up for renewal. Community activists see a chance to address environmental and health concerns regarding the burning — and say regulators see a opportunity to explore new technology to solve an old issue. “Is there anything we can […]
We are ready to send new Waste incinerator for Ethiopia. We arrange all shipping to Djibouti port. This shipping delivery with CIQ(CHINA ENTRY-EXIT INSPECTION AND QUARANTINE), Chamberized Commercial Invoice, CO, etc document/certification. See video show this web link: https://vimeo.com/235864206 Model YD300  Burning Rate Average 300 kgs/hour Feed Capacity Average 500 kgs Primary Combustion Chamber 2400 Liters Secondary Combustion Chamber 1200 Liters […]
Coronavirus Disease 2019 (COVID-19) pandemic continues all over the world, clinics,hospitals,goverment may need to consider on-site disposal for the infectious  medical waste. The medical waste incinerators that has been effectively used to dispose of hazardous waste during  viral outbreaks like Ebola. HICLOVER.COM reaches temperatures of up to 1200oC and is able to destroy health care […]
Basic Info. Model NO.:incinerator manufacturers in middle east Export Markets:Global Product Description Key Features:  * All models with Dual combustion chamber.  * Stainless Steel chimney/stack, long lifetime. *based on order  * High temperature, long lifetime of incinerator.  * Free or minimal installation on site.  * High speed, from 10kgs to 500kgs per hourto 6ton per […]
Product Description Nanjing Clover Medical Technology Co., Ltd.. Items/Model TS50(PLC) Picture   Burn Rate 50 kg/hour Feed Capacity 100kg Control Mode PLC Combustion Chamber 560L Internal Dimensions 100x80x70cm Secondary Chamber 280L Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V Power 0.7Kw Oil Consumption (kg/hour) 12.1–24 Gas Consumption (m3/hour) 9.9–26.1 Temperature Monitor Yes Temperature Protection […]
Incinerator Equipment Performance Requirements The principal activities of the Contract are the supply, install, commissioning and operations training. The required standards for the Contract activities are set out in the following Scope of Works below. The required minimum performance criteria for the incinerator to be provided by the bidder(s) is set out in this section. […]
HICLOVER Fighting COVID-19 CE ISO
HICLOVER Hot Blogs
Recent Posts