Medical Waste Incinerator Capacity: Average 300kgs per hour

WWW.HICLOVER.COMWaste Incinerators Auto Roll Air Filters
Nanjing Clover Medical Technology Co.,Ltd.

Tel:  +86-25-8461 0201   

Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: sales@hiclover.com
Email: hicloversales@gmail.com  

Items/Model

TS300(PLC)

Picture

Principle

Medical Waste Incineration Treatment

Burn Rate

Average 300 kg/hour

Feed Capacity

Average 400kg/feeding

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

2000L

Internal Dimensions

170x120x100cm

Secondary Chamber

1000L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V

Power

2.0Kw

Oil Consumption (kg/hour)

Average 38(DO)

Gas Consumption (m3/hour)

Average 45.6(NG)

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

500L

Feed Door

80x60cm

Chimney

10Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800-1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

11000kg

External Dimensions

400x210x300cm(without chimney)

Automated monitoring equipment for emission into air and water shall be properly calibrated by the manufacturer
Measurement requirements Continuous measurements of the following process operation parameters shall be considered to be performed, based on the 
manufacturer’s manual and the training to be provided by the vendor:
– temperature near The inner wall as indicated above.
 – Concentration of oxygen
 – Pressure
 – Temperature
 – Water vapor content of the exhaust gasd. The results of the measurements made to verify compliance with the emission 
limit values shall be standardized at the following conditions: temperature 273K, pressure 101.3KPa, 11% oxygen, dry gas, in exhaust gas from the incinerator. 

Supplementary operational requirements:
Manual operation Manual feed is preferred
Intelligent controls The incinerator shall be of a plug and play type for ease of installation and commissioning in remote locations. 
Controls shall include for burner gear, temperature indication and control of both the primary and secondary chambers. 
Plant, cycle and fault status indicators are similarly required.
Appropriate audible and visible alarms shall be included.
Combustion system Fully automated package with flame failure controls, integral fuel pump, solenoid valves, and integral 
continuous air fan and fuel sensors
Fuel Diesel oil
Fuel Storage Shall provide safe and secure fuel storage facilities compatible with  the  incinerator
A  fuel storage reservoir (tank), fuel filter and shutoff tap/valve shall be positioned securely) preferably within the perimeter 
of the dedicated building. The fuel tank shall not however be exposed  to the excessive  heat from the incinerator.
The  fuel tank  capacity  shall be  sized  to  match  the  capacity  of  the incinerator proposed and be large enough 
to store fuel for 7 days of operation.
The fuel tank shall include a welded steel containment basin to prevent escape of fuel in event of a tank rupture, 
sized at a minimum  of 150% of the tank capacity (the contractor shall alternatively  construct  a bund meeting  
these requirements  and  clearly specify this in their Technical Proposal).
The basin shall be primed and finish painted.
The fuel tank shall be made of heavy gauge steel construction. The tank shall include a removable,  
welded  steel top cover suitable for indoor applications.  The tank shall be coated with rust inhibitor within
 inner tank, primed and finish painted on external tank. All connections  shall be made with pipe unions to
 facilitate tank service/removal.  The tank shall be provided with atmospheric (normal) vent cap with screen and emergency pressure・ relief vent.