Advantages of incineration

Advantages of Waste Incineration

    Decreases Quantity of Waste. …
    Efficient Waste Management. …
    Production of Heat and Power. …
    Reduction of Pollution. …
    Incinerators Have Filters For Trapping Pollutants. …
    Saves on Transportation of Waste. …
    Provides Better Control Over Odor and Noise. …
    Prevents the Production of Methane Gas.

Incinerator Items/Model TS20(PLC) TS30(PLC)
Burn Rate (Average) 20-30 kg/hour 30-50 kg/hour
Feed Capacity(Average) 40kg/feeding 60kg/feeding
Control Mode PLC Automatic PLC Automatic
1st. Chamber Composition Hot Face Thickness: ≥115 mm Thickness: ≥115 mm
55% of Al203 55% of Al203
1750°C Grade 1750°C Grade
2nd. Chamber Composition Hot Face Thickness: ≥200 mm Thickness: ≥200 mm
75% of Al203 75% of Al203
1790°C Grade 1790°C Grade
Chamber Cold Face Material High Rate Refractory Ceramic Fiber High Rate Refractory Ceramic Fiber
Other Parts Hot Face Refractory Heavy Duty with steel fiber Heavy Duty with steel fiber
Burner operation Automatic On/Off Automatic On/Off
Dry Scrubber Including Including
Wet Scrubber Optional Optional
Top Loading Door Optional Optional
Paint for outside face 250°C Grade 250°C Grade
Sealing Material Refractory Ceramic Fiber Refractory Ceramic Fiber
Upgrade Containerized Mobile Type Optional Optional
CE Certificate CE(2006/42/EC,2014/30/EU CE(2006/42/EC,2014/30/EU
ISO Certificate  ISO9001:2015  ISO9001:2015
High-tech Enterprise Certificate  Yes Yes


What is the importance of incineration?
Incineration is widely used to reduce the volume of municipal solid waste, to 
reduce the potential infectious properties and volume of medical waste, and to 
reduce the potential toxicity and volume of hazardous chemical and biological waste.

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: sales@hiclover.com
Email: hicloversales@gmail.com  
plastic incineration process
nanjing clover medical technology co ltd
electic diesel incinerator
which chinese company’s are into waste management systems
how incinerators work
recycling rubbish plant

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.75Kw 0.83Kw 0.99Kw 1.2Kw
Diesel Oil Consumption (kg/hour) Ave.8.4 Ave.10.9 Ave.13.3 Ave.16.9
Natural Gas Consumption (m3n/hour) Ave.10.1 Ave.13 Ave.16 Ave.20.2
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Items/Model TS100(PLC) TS150(PLC) TS300(PLC) TS500(PLC)
Burn Rate (Average) 100 kg/hour 150 kg/hour 300 kg/hour 500 kg/hour
Control Mode PLC Auto. PLC Auto. PLC Auto. PLC Auto.
Combustion Chamber 1200L 1500L 2000L 3000L
Internal Dimensions 120x100x100cm 150x100x100cm 170x120x100cm 210x120x120cm
Secondary Chamber 600L 750L 1000L 1500L
Smoke Filter Chamber Dry Scrubber Dry Scrubber Dry Scrubber Dry Scrubber
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 1.38Kw 1.69Kw 2.57Kw 4.88Kw
Diesel Oil Consumption (kg/hour) Ave.20.4 Ave.24.2 Ave.33 Ave.44
Natural Gas Consumption (m3n/hour) Ave.24.5 Ave.29 Ave.39.6 Ave.52.8
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
The control system shall include an electronic performance monitoring and logging 
system. The system shall be capable of monitoring and logging chamber temperatures 
at regular intervals (not less than once per minute, with the capacity to vary the logging 
frequency). The system shall include the capacity to download the performance data by 
USB connection.
All the measuring devices attached with the incinerator should have digital display 
and should have provision of connecting to the recording system, which should include
fuel meter and separate energy meter.
The temperature shall be determined against the inside wall of the combustion 
chambers. An audible and visible alarm shall be installed to warn the operator when 
the secondary temperature drops to below the required temperature.
The primary chamber must meet or exceed the following criteria:
“• Heavy steel construction.
 thermocouple
• temperature gauge
• fire rope
• burner
• induction air fan
• digital temperature display panel”
Optional maintenance service The contractor shall deploy an expert, fully equipped 
with all required tools and equipment, to the client to provide maintenance service of the
 installed waste incinerators, including all the parts and components (e.g., burners, 
ignitors, temperature gauges) when required.  
4.5.1 The goods, including all packaging and packing thereof, conform to the 
specifications of the Contract, are fit for the purposes for which such goods are 
ordinarily used and for any purposes expressly made known in writing in the Contract, 
and shall be of even quality, free from faults and defects in design, material, 
manufacturer and workmanship;
4.5.2 If the Contractor is not the original manufacturer of the goods, the 
Contractor shall provide UNOPS with the benefit of all manufacturers’ 
warranties in addition to any other warranties required to be provided under the Contract;
4.5.3 The goods are of the quality, quantity and description required by the 
Contract, including when subjected to conditions prevailing in the place of final destination;
The goods are free from any right of claim by any third-party, including claims 
of infringement of any 4.5.4intellectual property rights, including, but not limited 
to, patents, copyright and trade secrets;
4.5.5 The goods are new and unused;
4.5.6 All warranties will remain fully valid following any delivery of the goods 
and for a period of not less than one (1) year following acceptance of the goods 
by UNOPS in accordance with the Contract;
4.5.7 During any period in which the Contractor’s warranties are effective, 
upon notice by UNOPS that the goods do not conform to the requirements 
of the Contract, the Contractor shall promptly and at its own expense correct 
such non-conformities or, in case of its inability to do so, replace the defective 
goods with goods of the same or better quality or, at its own cost, remove the
 defective goods and fully reimburse UNOPS for the purchase price paid for 
the defective goods; and,
4.5.8 The Contractor shall remain responsive to the needs of UNOPS for any 
services that may be required in connection with any of the Contractor’s 
warranties under the Contract.

Could not authenticate you.